Warning: mkdir(): No space left on device in /www/wwwroot/Z8.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/gyzljc.com/cache/9c/b1a9a/edb92.html): failed to open stream: No such file or directory in /www/wwwroot/Z8.COM/func.php on line 115
HENGTONG GROUP CO.,LTD.




小猪视频下载官网APP,小猪视频IOS下载安装无限,小猪视频黄色网站,小猪猪在线观看免费视频

News

News

Home| News| News

Hengtong Contributed to Installing the First Turbine of the 100,000-kW Grid-connected Wind Power Project in Tibet

2024-7-22 4785 Font size:

Jiangsu Hengtong Power Cable Co., Ltd. has proudly contributed to installing the first turbine of the 100,000-kW grid-connected wind power project in Tibet. Located at an average altitude of over 5,050 meters, with the highest turbine position reaching 5,200 meters, the project sets a new record for the global wind power industry in terms of altitude.

In the face of extreme environmental challenges, Hengtong developed a new type of power transmission material that enhanced current-carrying capacity by 14%, ensuring reliable power transmission in harsh conditions.

The project is expected to provide 223.7 million kWh of clean energy annually, saving 75,300 tons of coal equivalent and reducing carbon dioxide emissions by about 188,200 tons.

Committed to its goal of reaching carbon peak by 2028 and carbon neutrality by 2045, Hengtong hopes to participate in clean energy transformation and global sustainable development.


6ce26866113e5e61e5841209cad8067.png

网站地图