小猪视频下载官网APP,小猪视频IOS下载安装无限,小猪视频黄色网站,小猪猪在线观看免费视频

News

News

Home| News| News

Hengtong have successfully completed the installation of the latest-model large capacity WTGs of Bozhong-A 501MW Offshore Wind Farm

2022-9-15 5088 Font size:

Hengtong has installed the first wind turbine of the Bozhong Off-shore Wind Farm’s Site A project, setting a new milestone after last year’s record of installing 12 deep sea wind turbines within one month. It is estimated that the Site A project, which scales 60 sets of H220-8350 wind power generators with a capacity of 501 MW, will provide 1.698 billion kWh green power every year, saving some 519,800 tons of coal equivalent and cutting 1,257,700 or so tons of CO2 emissions.


Utilizing our strong installation competence, qualified solution and professional crew, Hengtong provides comprehensive services for offshore wind power globally; and higher capabilities are soon expected to be added.


Hengtong never stops greening the world with its expertise.

 

1663202330933.jpg

网站地图